CHARLESTON, W.Va. (AP) — A test failure of the Mountain Valley Pipeline in May resulted from a manufacturer defect, not corrosion, according to an independent report commissioned by its developers.
The report, completed by third-party risk management company DNV GL USA and released last Thursday, said the May 1 rupture was caused by a manufacturer’s defect in an elbow joint. The breach was the only failure during hydrostatic testing of the 303-mile (500-kilometer) pipeline, Mountain Valley owner EQT Midstream Vice President Justin Trettel wrote in a letter to the Pipeline and Hazardous Materials Safety Administration.
The Mountain Valley Pipeline took about a decade to complete before it began carrying gas under high pressure in late June.
The Federal Energy Regulatory Commission approved the project across rugged mountainsides in West Virginia and Virginia over longstanding objections from environmental groups, landowners and some elected officials.
Hydrostatic pressure testing is a common tool used to substantiate the strength of pipeline systems after their installation, Trettel wrote in the letter.
No injuries were reported from the rupture, which occurred in Roanoke County, Virginia.
2025-01-19 10:30238 view
2025-01-19 10:232973 view
2025-01-19 10:081616 view
2025-01-19 09:532970 view
2025-01-19 09:462881 view
2025-01-19 09:182814 view
The trash came raining down Saturday at Texas Tech.Water bottles. Tortillas. A vape. A beer bottle.M
It turns out everything was not as it seemed for Selena Gomez and Miley Cyrus during the early aught
PARIS — Lee Kiefer smiled at the thought of what people had just witnessed. At what she’d just helpe